On Friday November 29 Chris Palmer brought the rental concrete mixer to the club at 0900 hrs. Under leadership of Lorenzo and the assistance of Murray and Duncan, bag after bag of premix was poured into the mixer and with the added water, poured into the form. Lorenzo estimated they would need 25 bags of premix, when in fact they used 24 bags. In less than 90 minutes the project was completed. After setting for a few hours, Lorenzo put the finishing touch on the surface with a broom. It looks great. It is covered up and they have a little heater going to make sure the concrete cures properly.